Formula: Basic Time (min) = Observed Time (sec) × (Rating% / 100) ÷ 60 · SMV = Basic Time × (1 + Allowance% / 100)
| # | Task Name | Machine | Op Type | Observed (s) | Rating (%) | Basic Time | SMV | PPH | |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 0.00 | 0.00 | 0.00 | ||||||
| Totals | 0.00 | 0.00 | 0.00 | ||||||
Bottleneck SMV: 0.00 min
Line PPH: 0.00
Capacity status: —